Completed projects
SL.No | Client / End User | Project Title | Completion Date |
---|---|---|---|
1 | ![]() |
DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF TWIN STREAM METERING & REGULATION STATION (MRS) FOR NATURAL GAS AT NEW INDUSTRIAL AREA.(NATURAL GAS DISTRIBUTION) | 2012-2019 |
2 | ![]() |
ASSESSMENT STUDY OF MEASUREMENT SYSTEMS IN DUKHAN FIELDS | 2018-2019 |
3 | ![]() |
IMPLEMENTATION OF THREE (3) PCRs AT QP REFINERY, MESAIEED | 2018-2019 |
4 | ![]() |
REPLACEMENT OF LOCAL CONTROL PANELS FOR CHEMICAL INJECTION PACKAGES AT OFFSHORE LOCATIONS | 2018-2019 |
5 | ![]() |
SUPPLY, INSTALLATION AND COMMISSIONING OF AUTOMATIC FIRE SUPPRESSION SYSTEMS AT QP REFINERY, MESAIEED FOR ORIENTAL TRADING COMPANY LIMITED | 2018-2019 |
6 | ![]() |
PROVISION OF OPERATION & MAINTENANCE SERVICES FOR THE TWO (02) UNITS OF INCINERATORS AND ACCESSORIES AT HALUL ISLAND FOR OTC | 2014-2019 |
7 | ![]() |
EPIC FOR UPGRADING 500KVA EMERGENCY DG SET AT GD STATION ‘S’, MESAIEED OPERATIONS | 2017-2018 |
8 | ![]() |
MOBILISATION OF CUMMINS SERVICE ENGINEER AT GD STATIONS A4, A5 & BS-LBV-13 | 2018 |
9 | ![]() |
REPLACEMENT OF OBSOLETE CORIOLIS FLOW METERS 51-FE007 & 016 AT NFA-PS/4 | 2017-2018 |
10 | ![]() |
EPIC OF NGL INSTRUMENT PCRs AT MESAIEED | 2016-2018 |
11 | ![]() |
REPLACEMENT OF LRC PANEL FOR 2ND STAGE DE-SALTER FOR OTC | 2017-2018 |
12 | ![]() |
PIC OF PERMANENT POWER SUPPLY FOR SITE ESTABLISHMENT AND PROJECT WAREHOUSE (MOC-991) FOR AL BALAGH TRADING & CONTRACTING CO. W.L.L. | 2017-2018 |
13 | ![]() |
UPGRADATION WORKS FOR PACKAGES 1,3,4,5,6 & 7C IN DOHA STP & IA STP | 2017-2018 |
14 | ![]() |
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ELECTRICAL & FIRE FIGHTING EQUIPMENTS FOR X-RAY SCANNING SYSTEM AT ABU SAMRA FOR MINISTRY OF INTERIOR (MOI) / NUTEC | 2017 |
15 | ![]() |
SUPPLY AND FIXING OF TAGS FOR MANUAL VALVES | 2016-2017 |
16 | ![]() |
GC’S INSTALLATION AT QATAR SOLAR TECHNOLOGIES (QSTEC) RAS LAFFAN FOR SIEMENS | 2016-2017 |
17 | ![]() |
UNIT 63 RADIOACTIVE INSTRUMENTS REPLACEMENT FOR ENDRESS + HAUSER | 2017-2018 |
18 | ![]() |
INSTALLATION OF NEW POWER CABLES ABOVE GROUND IN LAFFAN REFINERY TANK FARM | 2015-2017 |
19 | ![]() |
SUPPLY INSTALLATION & COMMISSIONING OF INSTRUMENT / ELECTRICAL PCRs AT QP REFINERY – MESAIEED FOR OTC | 2015-2017 |
20 | ![]() |
EPIC FOR MISCELLANEOUS INSTRUMENTATION PCRS WITHIN DUKHAN FIELDS FOR OTC | 2014-2017 |
21 | ![]() |
EPIC FOR MITIGATION OF BURN PITS IN DUKHAN FOR PETROSERV LIMITED | 2014-2017 |
22 | ![]() |
INSTALLATION OF CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) AT Q-CHEM II | 2016 |
23 | ![]() |
REPLACEMENT OF EXISTING ACTUATORS WITH NEW ACTUATORS FOR MOV’S AT DIFFERENT LOCATIONS WITHIN DUKHAN FIELDS FOR OTC | 2014-2016 |
24 | ![]() |
EPIC FOR MISCELLANEOUS INSTRUMENTATION PCRS WITHIN DUKHAN FIELDS FOR OTC | 2015-2016 |
25 | ![]() |
EPIC OF 2″ PRESSURE FLARE PILOT LINE AT STATION A4, RAS LAFFAN FOR OTC | 2014-2015 |
26 | ![]() |
AUTOMATION OF WATER TREATMENT SYSTEM AT DR-1 PLANT | 2014 |
27 | ![]() |
EPIC FOR UPGRADING OF MEROX F&G DETECTION AND NGL – 1,2,3 & 4 FIRE WATER SYSTEM CONTROL PLC AT GAS OPERATIONS, MESAIEED FOR OTC | 2014-2015 |
28 | ![]() |
E & I WORKS FOR ORYX GTL MOC 963, 146, 640, 970 FOR AL BALAGH | 2014-2015 |
29 | ![]() |
REPLACEMENT OF S5 PLC SYSTEM (S5 TECHNOLOGY TO S7 TECHNOLOGY) OF WATER TREATMENT PLANT AT CC-3 | 2014 |
30 | ![]() |
ELECTRICAL, INSTRUMENTATION & F&G EXECUTION ACTIVITY FOR INSTALLATION, TESTING & COMMISSIONING ASSISTANCE FOR PETROSERV LIMITED | 2014-2015 |
31 | ![]() |
DESIGN, MANUFACTURING, SUPPLY AND COMMISSIONING OF FLOW METERS FOR PROCESS WATER & MACHINERY COOLING WATER AT DR-1 | 2014 |
32 | ![]() |
SIC OF SEAL GAS INJECTION TO TOP GAS FUEL & NATURAL GAS INJECTION TO COOLING GAS SCRUBBER VENTURI AT DR-2 MODULE | 2014 |
33 | ![]() |
AD-HOC MAINTENANCE SUPPORT FOR INCINERATORS AT HALUL FOR OTC | 2014 |
34 | ![]() |
EPIC FOR REPLACEMENT OF AIR COMPRESSORS AT QP REFINERY – MESAIEED FOR AL BALAGH | 2014 |
35 | ![]() |
F&G MODIFICATION IN NGL 1 (GE FANUC) FOR BLACKCAT | 2014 |
36 | ![]() |
EPIC OF NEW AIR COMPRESSOR AT FIELD SUPPORT LOGISTIC WORKSHOP – DUKHAN FOR AL BALAGH | 2013-2014 |
37 | ![]() |
AUTOMATION OF GENERAL AIR COMPRESSOR SYSTEM AT AIR SEPERATION PLANT CONTROL ROOM OF QATAR STEEL | 2013-2014 |
38 | ![]() |
PROVISION OF MANPOWER FOR MAINTENANCE OF INCINERATORS AT HALUL FOR OTC | 2013-2014 |
39 | ![]() |
EPIC FOR MECHANICAL PCR’S WITHIN DUKHAN – SUPPLY OF FULL BORE LEVEL CONTROL VALVE FOR AL BALAGH | 2013-2014 |
40 | ![]() |
SUPPLY, INSTALLATION & COMMISSIONING OF E&I MATERIALS AT ORYX GTL FOR AL BALAGH | 2013-2014 |
41 | ![]() |
REPLACEMENT OF MAGNETIC LEVEL TRANSMITTER TO GWR LEVEL TRANSMITTER IN NAO UNIT – ONLY INSTALLATION SCOPE FOR E&H | 2013-2014 |
42 | ![]() |
SUPPLY AND INSTALLATION OF AUTO ESD SYSTEM AT OLD & NEW SERVICE BERTH, RAS LAFFAN PORT AREA – ONLY INSTALLATION SCOPE FOR MEBD | 2013-2014 |
43 | ![]() |
EPIC OF DESICCANT TYPE PURGE GAS DRYER UNIT FOR DR-1 MODULE | 2013-2014 |
44 | ![]() |
AUTOMATION OF GENERAL AIR COMPRESSOR SYSTEM AT AIR SEPERATION PLANT | 2013-2014 |
45 | ![]() |
SUPPLY, FABRICATION, TESTING, COMMISSIONING OF HOT NATURAL GAS SUPPLY LINE FOR SUPERHEAT AT DR-2 MODULE | 2013-2014 |
46 | ![]() |
ON LINE COD & TSS ANALYZERS FOR PROCESS WASTE WATER TREATMENT UNIT AT RLOC | 2013-2014 |
47 | ![]() |
EPIC FOR REPLACEMENT OF FIRE & GAS SYSTEM IN NGL-1 MEROX PLANT, GAS OPERATIONS – MESAIEED FOR OTC | 2013-2014 |
48 | ![]() |
INSTALLATION OF ECHO AND NOISE REDUCTION ACOUSTIC MATERIALS AT DOMB WITHIN DUKHAN TOWNSHIP | 2013-2014 |
49 | ![]() |
EPIC OF ANALYTICAL AND PROCESS INSTRUMENTS IN DUKHAN WATER NETWORK | 2012-2014 |
50 | ![]() |
RELOCATION OF TWO (2) NO’S NIR ANALYZERS AT QP REFINERY – MESAIEED | 2012-2013 |
51 | ![]() |
EPIC OF LOAD MANAGEMENT SYSTEM & HVAC SIMATIC PLC S5 UPGRADE AT NFA | 2012-2013 |
52 | ![]() |
INSTALLATION OF NEW FISCAL GRADE GAS CHROMATOGRAPH IN QG1 | 2012-2013 |
53 | ![]() |
UPGRADATION OF TRANSITION ZONE CONTROL VALVE, PROCESS NATURAL GAS LINE AND VENTURI CONTROL FOR MAIN AIR FLOW CONTROL VALVE (FV-B07) AT DR-1 MODULE | 2012 |
54 | ![]() |
EPIC OF ADDITIONAL INSTRUMENTS TO ERG METERING AT NGL 4 – MESAIEED | 2012-2013 |
55 | ![]() |
DR-2 SILO CDRI PASSIVATION & MONITORING PROJECT FOR DIRECTION REDUCTION MODULE-2 | 2011-2012 |
56 | ![]() |
EPIC OF OXYGEN & MOISTURE ANALYZER SAMPLING SYSTEMS AT NFA | 2011-2012 |
57 | ![]() |
SUPPLY & INSTALLATION OF FLOW METER (1 NO.) FOR TSE IRRIGATION LINE DIAMETER 600mm | 2011-2012 |
58 | ![]() |
REFURBISHMENT OF INCINERATORS AND ACCESSORIES AT HALUL (INCLUDE CEMS MONITORING SYSTEM) FOR PETROSERV LIMITED | 2011-2012 |
59 | ![]() |
EPIC OF AUTOMATION OF SHUT – OFF VALVES FOR PROTECTION OF CATALYST BED FROM WATER CARRY OVER AT ORYX GTL – QATAR FOR AL BALAGH | 2011-2012 |
60 | ![]() |
DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF TWIN STREAM METERING & REGULATION STATION (MRS) FOR NATURAL GAS AT NEW INDUSTRIAL AREA | 2010-2015 |
61 | ![]() |
E & I WORKS FOR THE INSTALLATION OF CONTINUOUS EMISSION MONITORING SYSTEM – CEMS (MOC – 126) AT ORYX GTL PLANT – RAS LAFFAN FOR AL BALAGH | 2010 |
62 | ![]() |
SUPPLY, INSTALL AND COMMISSIONING OF ELECTRONIC WATER METERS AT MAIN WATER DISTRIBUTION LINE FOR ASPIRE ZONES FACILITIES | 2010-2011 |
63 | ![]() |
SUPPLY, INSTALLATION & COMMISSIONING OF RADIATION PORTAL MONITORING SYSTEM FOR NEW TRUCK SCALE | 2009-2010 |
64 | ![]() |
EPIC FOR ERG METERING PACKAGE AT NGL 4 PLANT – MESAIEED | 2008-2009 |