SL.No | Client / End User | Project Title | Completion Date |
---|---|---|---|
1 | DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF TWIN STREAM METERING & REGULATION STATION (MRS) FOR NATURAL GAS AT NEW INDUSTRIAL AREA.(NATURAL GAS DISTRIBUTION) | 2012-2019 | |
2 | ASSESSMENT STUDY OF MEASUREMENT SYSTEMS IN DUKHAN FIELDS | 2018-2019 | |
3 | IMPLEMENTATION OF THREE (3) PCRs AT QP REFINERY, MESAIEED | 2018-2019 | |
4 | REPLACEMENT OF LOCAL CONTROL PANELS FOR CHEMICAL INJECTION PACKAGES AT OFFSHORE LOCATIONS | 2018-2019 | |
5 | SUPPLY, INSTALLATION AND COMMISSIONING OF AUTOMATIC FIRE SUPPRESSION SYSTEMS AT QP REFINERY, MESAIEED FOR ORIENTAL TRADING COMPANY LIMITED | 2018-2019 | |
6 | PROVISION OF OPERATION & MAINTENANCE SERVICES FOR THE TWO (02) UNITS OF INCINERATORS AND ACCESSORIES AT HALUL ISLAND FOR OTC | 2014-2019 | |
7 | EPIC FOR UPGRADING 500KVA EMERGENCY DG SET AT GD STATION ‘S’, MESAIEED OPERATIONS | 2017-2018 | |
8 | MOBILISATION OF CUMMINS SERVICE ENGINEER AT GD STATIONS A4, A5 & BS-LBV-13 | 2018 | |
9 | REPLACEMENT OF OBSOLETE CORIOLIS FLOW METERS 51-FE007 & 016 AT NFA-PS/4 | 2017-2018 | |
10 | EPIC OF NGL INSTRUMENT PCRs AT MESAIEED | 2016-2018 | |
11 | REPLACEMENT OF LRC PANEL FOR 2ND STAGE DE-SALTER FOR OTC | 2017-2018 | |
12 | PIC OF PERMANENT POWER SUPPLY FOR SITE ESTABLISHMENT AND PROJECT WAREHOUSE (MOC-991) FOR AL BALAGH TRADING & CONTRACTING CO. W.L.L. | 2017-2018 | |
13 | UPGRADATION WORKS FOR PACKAGES 1,3,4,5,6 & 7C IN DOHA STP & IA STP | 2017-2018 | |
14 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ELECTRICAL & FIRE FIGHTING EQUIPMENTS FOR X-RAY SCANNING SYSTEM AT ABU SAMRA FOR MINISTRY OF INTERIOR (MOI) / NUTEC | 2017 | |
15 | SUPPLY AND FIXING OF TAGS FOR MANUAL VALVES | 2016-2017 | |
16 | GC’S INSTALLATION AT QATAR SOLAR TECHNOLOGIES (QSTEC) RAS LAFFAN FOR SIEMENS | 2016-2017 | |
17 | UNIT 63 RADIOACTIVE INSTRUMENTS REPLACEMENT FOR ENDRESS + HAUSER | 2017-2018 | |
18 | INSTALLATION OF NEW POWER CABLES ABOVE GROUND IN LAFFAN REFINERY TANK FARM | 2015-2017 | |
19 | SUPPLY INSTALLATION & COMMISSIONING OF INSTRUMENT / ELECTRICAL PCRs AT QP REFINERY – MESAIEED FOR OTC | 2015-2017 | |
20 | EPIC FOR MISCELLANEOUS INSTRUMENTATION PCRS WITHIN DUKHAN FIELDS FOR OTC | 2014-2017 | |
21 | EPIC FOR MITIGATION OF BURN PITS IN DUKHAN FOR PETROSERV LIMITED | 2014-2017 | |
22 | INSTALLATION OF CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) AT Q-CHEM II | 2016 | |
23 | REPLACEMENT OF EXISTING ACTUATORS WITH NEW ACTUATORS FOR MOV’S AT DIFFERENT LOCATIONS WITHIN DUKHAN FIELDS FOR OTC | 2014-2016 | |
24 | EPIC FOR MISCELLANEOUS INSTRUMENTATION PCRS WITHIN DUKHAN FIELDS FOR OTC | 2015-2016 | |
25 | EPIC OF 2″ PRESSURE FLARE PILOT LINE AT STATION A4, RAS LAFFAN FOR OTC | 2014-2015 | |
26 | AUTOMATION OF WATER TREATMENT SYSTEM AT DR-1 PLANT | 2014 | |
27 | EPIC FOR UPGRADING OF MEROX F&G DETECTION AND NGL – 1,2,3 & 4 FIRE WATER SYSTEM CONTROL PLC AT GAS OPERATIONS, MESAIEED FOR OTC | 2014-2015 | |
28 | E & I WORKS FOR ORYX GTL MOC 963, 146, 640, 970 FOR AL BALAGH | 2014-2015 | |
29 | REPLACEMENT OF S5 PLC SYSTEM (S5 TECHNOLOGY TO S7 TECHNOLOGY) OF WATER TREATMENT PLANT AT CC-3 | 2014 | |
30 | ELECTRICAL, INSTRUMENTATION & F&G EXECUTION ACTIVITY FOR INSTALLATION, TESTING & COMMISSIONING ASSISTANCE FOR PETROSERV LIMITED | 2014-2015 | |
31 | DESIGN, MANUFACTURING, SUPPLY AND COMMISSIONING OF FLOW METERS FOR PROCESS WATER & MACHINERY COOLING WATER AT DR-1 | 2014 | |
32 | SIC OF SEAL GAS INJECTION TO TOP GAS FUEL & NATURAL GAS INJECTION TO COOLING GAS SCRUBBER VENTURI AT DR-2 MODULE | 2014 | |
33 | AD-HOC MAINTENANCE SUPPORT FOR INCINERATORS AT HALUL FOR OTC | 2014 | |
34 | EPIC FOR REPLACEMENT OF AIR COMPRESSORS AT QP REFINERY – MESAIEED FOR AL BALAGH | 2014 | |
35 | F&G MODIFICATION IN NGL 1 (GE FANUC) FOR BLACKCAT | 2014 | |
36 | EPIC OF NEW AIR COMPRESSOR AT FIELD SUPPORT LOGISTIC WORKSHOP – DUKHAN FOR AL BALAGH | 2013-2014 | |
37 | AUTOMATION OF GENERAL AIR COMPRESSOR SYSTEM AT AIR SEPERATION PLANT CONTROL ROOM OF QATAR STEEL | 2013-2014 | |
38 | PROVISION OF MANPOWER FOR MAINTENANCE OF INCINERATORS AT HALUL FOR OTC | 2013-2014 | |
39 | EPIC FOR MECHANICAL PCR’S WITHIN DUKHAN – SUPPLY OF FULL BORE LEVEL CONTROL VALVE FOR AL BALAGH | 2013-2014 | |
40 | SUPPLY, INSTALLATION & COMMISSIONING OF E&I MATERIALS AT ORYX GTL FOR AL BALAGH | 2013-2014 | |
41 | REPLACEMENT OF MAGNETIC LEVEL TRANSMITTER TO GWR LEVEL TRANSMITTER IN NAO UNIT – ONLY INSTALLATION SCOPE FOR E&H | 2013-2014 | |
42 | SUPPLY AND INSTALLATION OF AUTO ESD SYSTEM AT OLD & NEW SERVICE BERTH, RAS LAFFAN PORT AREA – ONLY INSTALLATION SCOPE FOR MEBD | 2013-2014 | |
43 | EPIC OF DESICCANT TYPE PURGE GAS DRYER UNIT FOR DR-1 MODULE | 2013-2014 | |
44 | AUTOMATION OF GENERAL AIR COMPRESSOR SYSTEM AT AIR SEPERATION PLANT | 2013-2014 | |
45 | SUPPLY, FABRICATION, TESTING, COMMISSIONING OF HOT NATURAL GAS SUPPLY LINE FOR SUPERHEAT AT DR-2 MODULE | 2013-2014 | |
46 | ON LINE COD & TSS ANALYZERS FOR PROCESS WASTE WATER TREATMENT UNIT AT RLOC | 2013-2014 | |
47 | EPIC FOR REPLACEMENT OF FIRE & GAS SYSTEM IN NGL-1 MEROX PLANT, GAS OPERATIONS – MESAIEED FOR OTC | 2013-2014 | |
48 | INSTALLATION OF ECHO AND NOISE REDUCTION ACOUSTIC MATERIALS AT DOMB WITHIN DUKHAN TOWNSHIP | 2013-2014 | |
49 | EPIC OF ANALYTICAL AND PROCESS INSTRUMENTS IN DUKHAN WATER NETWORK | 2012-2014 | |
50 | RELOCATION OF TWO (2) NO’S NIR ANALYZERS AT QP REFINERY – MESAIEED | 2012-2013 | |
51 | EPIC OF LOAD MANAGEMENT SYSTEM & HVAC SIMATIC PLC S5 UPGRADE AT NFA | 2012-2013 | |
52 | INSTALLATION OF NEW FISCAL GRADE GAS CHROMATOGRAPH IN QG1 | 2012-2013 | |
53 | UPGRADATION OF TRANSITION ZONE CONTROL VALVE, PROCESS NATURAL GAS LINE AND VENTURI CONTROL FOR MAIN AIR FLOW CONTROL VALVE (FV-B07) AT DR-1 MODULE | 2012 | |
54 | EPIC OF ADDITIONAL INSTRUMENTS TO ERG METERING AT NGL 4 – MESAIEED | 2012-2013 | |
55 | DR-2 SILO CDRI PASSIVATION & MONITORING PROJECT FOR DIRECTION REDUCTION MODULE-2 | 2011-2012 | |
56 | EPIC OF OXYGEN & MOISTURE ANALYZER SAMPLING SYSTEMS AT NFA | 2011-2012 | |
57 | SUPPLY & INSTALLATION OF FLOW METER (1 NO.) FOR TSE IRRIGATION LINE DIAMETER 600mm | 2011-2012 | |
58 | REFURBISHMENT OF INCINERATORS AND ACCESSORIES AT HALUL (INCLUDE CEMS MONITORING SYSTEM) FOR PETROSERV LIMITED | 2011-2012 | |
59 | EPIC OF AUTOMATION OF SHUT – OFF VALVES FOR PROTECTION OF CATALYST BED FROM WATER CARRY OVER AT ORYX GTL – QATAR FOR AL BALAGH | 2011-2012 | |
60 | DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF TWIN STREAM METERING & REGULATION STATION (MRS) FOR NATURAL GAS AT NEW INDUSTRIAL AREA | 2010-2015 | |
61 | E & I WORKS FOR THE INSTALLATION OF CONTINUOUS EMISSION MONITORING SYSTEM – CEMS (MOC – 126) AT ORYX GTL PLANT – RAS LAFFAN FOR AL BALAGH | 2010 | |
62 | SUPPLY, INSTALL AND COMMISSIONING OF ELECTRONIC WATER METERS AT MAIN WATER DISTRIBUTION LINE FOR ASPIRE ZONES FACILITIES | 2010-2011 | |
63 | SUPPLY, INSTALLATION & COMMISSIONING OF RADIATION PORTAL MONITORING SYSTEM FOR NEW TRUCK SCALE | 2009-2010 | |
64 | EPIC FOR ERG METERING PACKAGE AT NGL 4 PLANT – MESAIEED | 2008-2009 |